Taking STP thermal insulation system construction of a high-rise residential buildings as an example, this paper introduced the con-struction process of energy-saving STP board thermal insulation system, from the base inspection process, adhesive mortar preparation, STP paste process, product protection and other aspects elaborated specific operation main points, and summarized the key details of construction quality control, in order to ensure the construction quality.%以某高层住宅建筑中STP保温系统施工为例,介绍了节能型STP板保温系统的施工工艺流程,从基层的检查处理、粘结砂浆配制、STP粘贴工艺、成本保护等方面阐述了具体的施工操作要点,并总结了施工质量控制的关键细节,以确保施工质量。
展开▼