Combining with engineering cases,the paper introduces the adoption of lowering underground water level and dynamic compaction from the identification of controlled depth of underground water level,selection for dewatering method,dewatering construction craft,and dynamic construction points,sums up the quality control measures during the construction process,and points out the method is simple and fast with less materials and lower cost.%结合工程实例,从地下水位控制深度的确定、降水方法的选择、降水施工工艺、强夯施工要点等方面介绍了高水位场地采取降低地下水位再强夯的施工方法,总结了施工过程中的质量控制措施,指出该方法具有施工简便、速度快、材料用量少、造价低等优势。
展开▼