首页> 外文学位 >Long-term implications of dam removal for mesohabitat and macroinvertebrate communities in Michigan and Wisconsin rivers.
【24h】

Long-term implications of dam removal for mesohabitat and macroinvertebrate communities in Michigan and Wisconsin rivers.

机译:拆除水坝对密歇根州和威斯康星州河流的中生境和大型无脊椎动物群落的长期影响。

获取原文
获取原文并翻译 | 示例

摘要

The removal of the numerous aging dams in the United States has recently been a highly sought after stream restoration technique. The extent to which the damage done to streams by dams is reversed upon removal is unknown, especially on decadal time scales. The objectives of this study were to determine if mesohabitat heterogeneity and macroinvertebrate assemblages within rivers recover following the removal of a dam, and to estimate the time needed for recovery. A space-for-time substitution study was employed on 8 rivers in various stages of recovery following a dam removal, ranging from <1--40 years post-removal. Within each river, mesohabitat was mapped and macroinvertebrates sampled in a zone unaffected by the dam removal and two zones impacted by the dam removal (former impoundment and downstream zone), and compared to evaluate the extent of recovery. Mesohabitat recovery was variable, with some rivers recovering substantial heterogeneity within 7 years of removal while others exhibited much lower levels than the reference zone even after 40 years following dam removal. Generally, the macroinvertebrate community recovered 3--7 years following removal both in terms of taxonomic similarity and richness, although densities took decades to recover. Dam removal poses as a beneficial restoration technique yet the recovery of important stream components can be variable and may take longer than previous research has suggested.
机译:最近,在美国,人们急需拆除溪流修复技术来清除众多老化的水坝。大坝对溪流造成的破坏在多大程度上可以逆转,这是未知的,特别是在十年的时间尺度上。这项研究的目的是确定拆除大坝后河流中的中栖息地异质性和大型无脊椎动物组合是否恢复,并估计恢复所需的时间。在拆除大坝后的<1--40年内,对大坝拆除后不同恢复阶段的8条河流进行了时空替代研究。在每条河中,对中栖动物进行了测绘,并在不受水坝拆除影响的区域和受水坝拆除影响的两个区域(前水库和下游区域)中取样了无脊椎动物,并进行了比较,以评估恢复程度。中生境恢复是可变的,有些河流在拆除后的7年内恢复了相当大的异质性,而其他河流甚至在拆除大坝后40年也表现出比参考区低得多的水位。通常,从密度相似性和丰富性上讲,大型无脊椎动物群落在撤离后3--7年恢复,尽管密度需要数十年才能恢复。拆除大坝是一种有益的修复技术,但是重要的河流组分的修复可能是可变的,并且可能需要比以前的研究更长的时间。

著录项

  • 作者

    Hansen, Jonathan Ford.;

  • 作者单位

    Michigan State University.;

  • 授予单位 Michigan State University.;
  • 学科 Biology Ecology.;Agriculture Fisheries and Aquaculture.
  • 学位 M.S.
  • 年度 2008
  • 页码 108 p.
  • 总页数 108
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号