【24h】

Improvement of allowable wheel load by a new type of crane rail

机译:新型吊车轨道提高了车轮容许载荷

获取原文
获取原文并翻译 | 示例

摘要

Sixteen cases of failure in crane rails have been analyzed and found to be caused by fatigue,which has been classified in three categories.The authors have succeeded in reproducing one of these failures in the laboratory and have found that the cracks were cuased by the eccentric load at the head of the crane rail.From this they have developed a new type of crane rail in which resistance to fatigue is increase by a factor of 20 with only a 3 to 4
机译:分析了十六个起重机导轨故障案例,并发现其是由疲劳引起的,分为三类。作者成功地在实验室中再现了其中一种故障,并发现裂纹是由偏心引起的。他们由此开发出了一种新型的起重机导轨,其抗疲劳性提高了20倍,而只有3到4

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号