First Offshore Hydraulic-Jet-Fracturing Multizone Completion ApplicationCase Study: Challenges and Lessons Learned in the Bozhong Oil Field,Bohai Bay, China

机译:第一个海上液压喷射 - 压裂多态完成ApplicationCase学习:渤海湾渤海湾渤海油田挑战与经验教训

获取原文

摘要

The first hydraulic-jet-fracturing multizone completion application was performed in an offshore high-permeability oil well located in the Bozhong oil field in Bohai Bay, China. A detailed case study is presented,highlighting operational challenges and lessons learned from the offshore multizone completion in theBozhong field. Most offshore high-permeability oilwell completions in the Bozhong field employ tubing conveyedperforation (TCP) followed by frac-packing as multi-zone completions, which is practical in this field.Unlike conventional multizone frac-pack completions, to run perforation guns, the perforating must becompleted first, followed by running isolation packers to complete the multizone frac-packing treatments.For hydraulic-jet-fracturing multizone completions, the hydraulic jetting tools are delivered to the targetdepth using drill pipe; following that, slurry fluid is pumped through the drill pipe to cut through the casingto create fluid flowing channels, which communicate with the pay zone formation. Lastly, the fracturingoperation is completed by pumping both proppant slurry through the drill pipe and cleaning fluid throughthe annulus simultaneously, which creates dynamic hydraulic diversion as functions of isolation betweenzones. After completing one treatment zone, the tools are pulled to the next target depth, repeating theprocedures, until the entire well is complete. After the fracturing treatment, the operator runs productiontubing and other accessories, putting the well into production as usual. A detailed completion design and step-by-step operational procedures were prepared based on welldata and work conditions to help ensure the effectiveness and safety of the offshore operation. Althoughsome challenges were encountered during the operation, it was overall successfully performed, andsignificant performance improvement was achieved. After being in production for months, the candidatewell has maintained a longer high-production-rate period than the offset wells completed using conventionalmultizone frac-pack completions.
机译:第一液压喷射压裂多区完成申请公位于中国渤海湾渤中油田离岸高渗透性油进行。详细的案例进行了分析,突出业务挑战,并从theBozhong场海上多区完成教训。最近海高导磁率油井完井在随后压裂充填称为多区完井,这是实际的本field.Unlike常规多区压裂充填完井中,为了运行射孔,穿孔的渤字段雇用管conveyedperforation(TCP)必须首先becompleted,接着运行隔离封隔器来完成压裂充填treatments.For液压喷射压裂多区完井,液压喷射工具使用钻杆传递到targetdepth多区;以下的是,淤浆流体通过钻杆通过casingto泵送到切割创建流体流动通道,其与所述油层地层连通。最后,fracturingoperation由通过钻杆泵送既支撑剂浆液和清洁同时流体throughthe环,这产生动态液压分流作为隔离betweenzones的功能完成。完成一个处理区后,这些工具都拉到下一个目标深度,重复theprocedures,直到整个井完成。压裂后,操作员运行productiontubing等配件,将井投入生产照常进行。基于welldata和工作条件,帮助准备的详细设计完成,并一步一步的操作流程确保海上作业的有效性和安全性。在操作过程中遇到的挑战虽然一些,它被整体成功执行,andsignificant的性能提升达到了。在生产中是几个月后,candidatewell一直保持更长的高产率的时间比使用conventionalmultizone压裂充填完井完成了邻井。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号