首页> 外文会议>International Conference on Electronic, Mechanical, Information and Management >High Geostress Active Fault Zones Geology Tunnel Construction Deformation Monitoring Technology Research
【24h】

High Geostress Active Fault Zones Geology Tunnel Construction Deformation Monitoring Technology Research

机译:高地高度活性断层区地质隧道施工变形监测技术研究

获取原文

摘要

Grew up in deep buried tunnels are often encounter many unfavorable geological conditions, construction of Sichuan songpan project is located in the southern section of minjiang river faulting footwall tunnel on the right side, through the debris flow, landslide and soft rock large deformation DeZhiDai high in-situ stress. By optimizing the project activity fault zone of deformation monitoring in weak rock tunnel, tunnel hole body application advance small duct grouting support; Excavation steps method is used to add temporary inverted arch construction, arch combined hollow bolt, sidewall type bonding mortar anchor, such as the construction process, to effectively control deformation. Provide certain guidance and reference for the similar engineering construction.
机译:在深埋隧道中长大往往遇到许多不利的地质条件,建设四川松潘项目位于闽江南部的南部右侧脚下隧道,通过泥石流,滑坡和软岩大变形Deziidai高-Situ压力。通过优化弱岩隧道变形监测的项目活动故障区,隧道孔体应用推进小管道灌浆支撑;挖掘步骤方法用于添加临时倒立拱结构,拱形组合中空螺栓,侧壁式粘接砂浆锚,如施工过程,有效地控制变形。为类似的工程建设提供一定的指导和参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号