首页> 外文会议>Abu Dhabi International Petroleum Exhibition Conference >Maximizing Hydrocarbon Recovery and Water Injection Support through Pattern Reviews Between Injector Producer Pairs in a Large,Complex,and Faulted Brown Field in SE Asia
【24h】

Maximizing Hydrocarbon Recovery and Water Injection Support through Pattern Reviews Between Injector Producer Pairs in a Large,Complex,and Faulted Brown Field in SE Asia

机译:通过在SE亚洲的大型,复杂和断层棕色田地中的喷射器生产者对之间的模式评价,通过模式评测最大限度地提高碳氢化合物回收和注水支持

获取原文

摘要

Large,complex and faulted structures often pose substantial challenges in maximizing hydrocarbon recovery.This is largely due to limited understanding of field wide connectivity of reservoir sands,across fault communication,and uncertainty in reservoir fluid contacts due to a fewer well penetrations in early life of the field.In addition,secondary recovery through water injection support brings further complexities in such fields,particularly in stacked reservoirs with multiple sands completed across individual production zones.The work presented in this paper has utilized'pattern reviews'technique in a brown field containing over 500 well penetrations in South East Asia.Pattern reviews have made use of reservoir pressure data,fault maps,sand/shale correlations,salinity variations between formation and Sea water,and injection and production data by carving out specific sections of the field containing injector-producer pairs.The integrated data and analyses have helped establishing connections,or otherwise,between injector-producer pairs across various parts of the field.Time lapse Production Logging(PLT)campaigns were executed to provide additional supporting evidence on flushing of certain reservoir sands in producer wells and preferential injection zones in injector wells.Systematic selection of patterns containing injector-producer pairs across the field has provided a substantial support in our static and dynamic modelling work to establish reservoir/fault connectivity within fault blocks and across the field.This has subsequently helped in history matching production data as well as identifying infill opportunities for bypassed oil.The present work has also helped in optimizing water flood and choosing certain injectors/zones to open/close for pressure support.An understanding on the connectivity between injector-producer pairs has also helped in identifying areas with low recovery and poor sweep.This has paved the way in initiating a pilot project for Polymer injection in this field to help understand incremental recovery in addition to water flood.A successful outcome would initiate field wide polymer injection with a potential of 10's of mmboe incremental recovery from the field.For the first time in field history,pattern reviews have been extensively used as a tool to understand reservoir connectivity and dynamic fluid movements across the field.An additional attempt has been made to use ant track maps to help identify potential baffles and sub-seismic faults.An integrated effort between the various data and disciplines have provided fresh insights into the reservoirs and which would have otherwise been difficult in heterolythic nature stacked reservoirs.
机译:大型,复杂和故障的结构往往在最大化的碳氢化合物回收方面造成了重大挑战。这主要是由于对水库砂岩的宽连接的了解,跨越故障通信,并且储层流体接触的不确定性由于早期寿命较少该领域加法,通过注水支撑的二次恢复在这些领域中带来了进一步的复杂性,特别是在堆叠的储存器中,在各个生产区内完成的多个沙子。本文提出的工作已经利用了含有棕色田间的型号在东南亚的500多个良好的渗透.Pattern评论已经使用了水库压力数据,故障图,沙子/页岩相关性,形成和海水之间的盐度变化,以及通过雕刻含有喷射器的领域的特定部分来注射和生产数据-Producer对。集成数据和分析有助于建立符合要求在跨越田间的各个部分的喷射器制作人对之间的一部分或其他方面。执行了生产记录(PLT)运动,以提供关于在喷射器井中的生产者井和优先注射区的一定的水库砂冲洗额外的支持证据.Systematic在整个领域中包含注射器 - 生产者对的图案的选择在我们的静态和动态建模工作中提供了大量支持,以建立故障块内的储层/故障连接,并在历史匹配生产数据以及识别中有所帮助绕过油的填充机会。目前的工作也有助于优化水洪水,并选择某些注射器/区域以打开/关闭压力支持。关于喷射器 - 生产者对之间的连接也有助于识别恢复低的区域可怜的扫描。这已经铺平了发起的聚合物试点项目在该领域中注射以帮助了解增量恢复,除了水洪水之外。成功的结果将引发领域宽的聚合物注射,其潜力从该领域的MMBBEE增量恢复的潜力。在现场历史中第一次,模式评价已经广泛用作理解储层连接和动态流体运动的工具。已经进行了额外的尝试,使用蚂蚁轨道地图来帮助识别潜在的挡板和次地震断层。各种数据和学科之间的综合努力提供了新鲜洞察水库,在异质特性堆叠储层中仍有困难。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号