首页> 外文会议>International Conference on Renewable Energy and Environmental Technology >Discussion on the Using Of TQC Theory in Project Management in Water Supply Engineering
【24h】

Discussion on the Using Of TQC Theory in Project Management in Water Supply Engineering

机译:关于水供应工程项目管理中TQC理论的探讨

获取原文

摘要

The number of study about TQC theory in the project planning and construction period is more than project operation period. Taking the water supply project as an example, in the operation period of the project management mainly relates to the technical management and system management, and take advantage of facilities management theory, discussed water supply project in how to apply the theory of project management. In order to improve China's management level in water supply engineering.
机译:关于项目规划和施工期间TQC理论的研究数量超过项目运营期。 以供水项目为例,在项目管理的运营期间主要涉及技术管理和系统管理,并利用设施管理理论,讨论了如何应用项目管理理论的供水项目。 为了提高中国水资源工程管理水平。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号