首页> 外文会议>Conference and Exposition on Manufacturing 4 the Future - Aerospace, Defense, Medical, and Energy >Risk-based Planning and Scheduling (RPS) Solution for Lockheed Martin Aeronautics - (PPT)
【24h】

Risk-based Planning and Scheduling (RPS) Solution for Lockheed Martin Aeronautics - (PPT)

机译:洛克希德马丁航空公司的基于风险的规划和调度(RPS)解决方案 - (PPT)

获取原文

摘要

Complex buyer/supplier relationships heighten schedule risk and require an enterprise perspective. Enterprise simulation allows understanding tradeoffs rather than relying on intuition. RPS is a new technology that permits broader understanding of performance risks and their causes. OO simulation technology provides greater flexibility, power, ease of use, and rapid modeling. Risk-based models provide a valuable management tool for evaluating strategic business decisions.
机译:复杂的买家/供应商关系提升了日程风险,并要求企业视角。企业仿真允许了解权衡而不是依靠直觉。 RPS是一种新技术,允许更广泛地了解性能风险及其原因。 OO仿真技术提供了更大的灵活性,功率,易用性和快速建模。基于风险的模型为评估战略业务决策提供了有价值的管理工具。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号