首页> 外文会议>International Conference on Green Building, Materials and Civil Engineering >Analysis of shield tunnel stability during construction period using elliptic umbilic catastrophe model
【24h】

Analysis of shield tunnel stability during construction period using elliptic umbilic catastrophe model

机译:椭圆脐灾难模型施工期间盾构隧道稳定性分析

获取原文

摘要

Using the monitoring data, an expression of ground settlement with associated coordinates above shield tunnel during construction was established, in which coefficients were obtained by the least square method. After transforming this expression into a standard form of elliptic umbilic catastrophe model, the instability criterion for the soil above shield tunnel was determined with the analysis of this model. Instability criterion values were thereafter obtained then the soil state would be judged according to these values. Three cases in different regions in China, referred to Bund Channel in Shanghai, metro line 1 in Chengdu City and metro line 4 in Beijing, were presented. They showed that the method developed in this paper was suitable in analyzing and forecasting the stabilities of soil above shield tunnels.
机译:使用监测数据,建立了施工期间屏蔽隧道上方的相关坐标的地面沉降的表达,其中通过最小二乘法获得系数。在将该表达转化为椭圆形脐灾变模型的标准形式之后,利用该模型的分析确定屏蔽隧道上方的土壤的不稳定性标准。此后,将不稳定标准值得到,然后根据这些值判断土壤状态。提出了三种在中国不同地区的案例,提交了上海的外滩频道,在成都市的地铁1号线和北京地铁4号线。他们表明,本文开发的方法适用于分析和预测屏蔽隧道上方土壤的稳定性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号