首页> 外文会议>SPE International Symposium and Exhibition on Formation Damage Control >Remediation of Long-Term Production Deferrals from Formation Damage in a Depleted Transylvanian Sandstone Reservoir
【24h】

Remediation of Long-Term Production Deferrals from Formation Damage in a Depleted Transylvanian Sandstone Reservoir

机译:从耗尽的特制兰替尼砂岩储层中的形成损坏中的长期产量延迟修复

获取原文

摘要

The work completed was a comprehensive approach of understanding and treating formation damage to further redevelop a mature asset through successful remediation operations. The identification of skin was completed with slickline techniques and reservoir and production flow profile monitoring. Primary formation damage mechanisms were naturally occurring scales in the near wellbore, damage caused by water blockages and workover fluids. Redesigned completion fluids, acid pumping and innovative coiled tubing tools were used in the remediation works which were all firsts in the basin. A modified decline curve analysis technique was used to economically justify treatment of nearly all wells in the field and led to substantial production increases. In 2003, an Association was formed to manage a mature Romanian gas field producing since 1970. Production skin was evident and in 2010 a well failed due to halite formation. Consequently, liquid and solid sampling tools were deployed within suspect wellbores. In 2010, a new workover fluid formulation was introduced but despite improvements formation damage was still induced. From 2010 to 2013, there had been an increased focus on understanding and treating calcite, halite and water block damages to boost field-wide productivity. Formation damage was observed as being both naturally occurring and induced in the field. An initial assessment and pilot treatment of 10% of the wells led to a near 40% incremental gain in those wells. After which, the campaigns were further expanded to over 75% of the field. Technically, the investigation into formation damage changed the development plan for the field going forward. Operationally, the intervention procedures introduced were new to the basin and have been adopted by the Association's partners in other assets. A major limit on ultimate recovery from depleted hydrocarbon reservoirs is declining well productivity. Salt formation, scale deposition, and water blockage restricts flow, reducing production rates and ultimate recovery of reserves. Therefore, economic formation damage management is an essential tool for extending field life, increasing profitability, and improving recovery of aging assets. Impressive results led to a strategic shift in local field production management and the techniques are useful worldwide in similar fields.
机译:完成的工作是通过成功的修复行动进一步重新开发成熟资产的综合理解和治疗形成损害的综合方法。用SLICKLINE技术和水库和生产流程曲线监测完成皮肤的鉴定。初级形成损伤机制自然发生在井筒接近井筒中,由水堵塞和工艺液体造成的损害。重新设计的完井流体,酸泵送和创新的盘绕管工具被用来在盆地中的所有首先第一件。改进的衰减曲线分析技术用于经济地证明对现场的几乎所有井的处理,并导致大量产量增加。 2003年,一项协会是为了管理自1970年以来的成熟罗马尼亚天然气场。生产皮肤是明显的,2010年由于宿舍的形成,井失效。因此,液体和固体采样工具部署在嫌疑孔孔中。 2010年,介绍了一种新的内部内部工作流体制剂,但尽管仍然诱导了形成损伤。从2010年到2013年,有一个焦点对理解和治疗方解石,宿舍和水块损害造成的措施,以提高领域的生产力。观察到形成损伤是天然存在并在该领域诱导。初步评估和试验治疗10%的井导致在那些井中的较近40%的增量增益。之后,该活动进一步扩展到超过75%的领域。从技术上讲,对形成造成的调查改变了领域的发展计划。在运作上,引入的干预程序是盆地的新手,并已由协会的合作伙伴在其他资产中通过。从耗尽的碳氢化合物储层终极回收的主要限制下降良好的生产率。盐形成,缩放沉积和水堵塞限制流动,降低生产率和储备的最终回收率。因此,经济地层损害管理是扩展现场生活,增加盈利能力和改善老化资产的复苏的重要工具。令人印象深刻的结果导致了当地领域生产管理的战略转变,并且在类似领域的全球技术是有用的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号