首页> 外文会议>International Conference on Geological Engineering >Stability Analysis for Post-office Building Landslide in Xingshan County, Three Gorges Reservoir Area
【24h】

Stability Analysis for Post-office Building Landslide in Xingshan County, Three Gorges Reservoir Area

机译:三峡库区兴山县后办公楼滑坡稳定性分析

获取原文

摘要

Post-office building landslide in Xingshan county is the slide of covering soils of Quaternary and strong weathering rockmass, which results from bending and topping deformation of the soft and steep rockmass caused by gravitational stresses. The prime deformation of the landslide happened in April 1994, and became worse in June. There are several transverse tension cracks with plumb dislocation in the ground. The longest one was 40m long and 3cm width. Some houses and theirs cement floor cracked. After the slide, some houses on the middle of landslide body were abandoned, anti-slide plies were used to control the landslide as an emergency measures. Heavy rain, domestic water seepage, and building load on the back are the essence inducement of its slide. After Three Gorges Reservoir restores water, the front of post-office building landslide will be immerged, and its stability will become further worse. The stability analysis with finite element method and block limit equilibrium method shows the deformable body will be instable and need treatment. Anti-sliding piles with surface drainage and revetment system have been advised to reinforce the landslide.
机译:兴山县的办公楼山体滑坡是覆盖四季和强大风化岩石渣的覆盖土壤,这是由引力应力引起的柔软和陡峭岩石的弯曲和顶部变形。 Landslide的主要变形发生在1994年4月,并在六月变得更糟。地面上有几个横向张力裂缝,垂直位错。最长的一个是40米长3cm宽度。一些房屋和他们的水泥地板破裂了。幻灯片后,山体内体中间的一些房屋被抛弃,抗滑型层被用来控制滑坡作为应急措施。背部大雨,国内水渗水和建筑负荷是其滑块的精华诱导。经过三峡库区恢复水后,落后楼梯滑坡的前部将被灭产,其稳定性将进一步变得更糟。具有有限元方法和块极限平衡方法的稳定性分析表明可变形体将是不稳定的,需要治疗。建议用表面排水和护垫系统进行防滑动桩,以加强滑坡。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号