首页> 外文会议>International Conference on Geological Engineering >Seepage Stability of the Dam Foundation of Luhun Reservoir
【24h】

Seepage Stability of the Dam Foundation of Luhun Reservoir

机译:鲁村水库大坝基金会渗透稳定性

获取原文

摘要

Based on the supposed seepage model and the boundary conditions of the dam foundation, this paper, with numerical simulation and statistical method as research method, centers on the hydraulic gradient of the seepage field and the seepage stability of the dam foundation of Luhun Reservoir. According to the study, the dam functions well because when the reservoir is slowly filled with water, the hydraulic gradients of the cutoff trench, the belt of overflow, and the fault fracture zone of the dam foundation are much smaller than the allowable index, posing no danger to the stability of the dam foundation. This study furnishes theoretical support to the normal work of the reservoir when the supposed water level is 319.5m, 327.5m, 331.8m.
机译:基于假定的渗流模型和坝基边界条件,本文采用数值模拟和统计方法作为研究方法,中心渗流场液压梯度的中心及鲁恒水库大坝基础的渗流稳定性。根据该研究,大坝功能良好,因为当储存器慢慢充满水时,截止沟槽的液压梯度,溢流带和坝基的故障骨折区域远小于允许指数,构成远小得多没有危险的坝基的稳定性。本研究为假定的水位为319.5米,327.5m,331.8M时,本研究提供了对水库正常工作的理论支持。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号