INTEGRATED ENGINEERING AND PRODUCTION OPERATION TO REVITALIZE BROWN FIELD OIL PRODUCTION

机译:综合工程和生产运作,振兴棕色田外油生产

获取原文

摘要

JN field is located in the northern part of South Sumatra Block, Indonesia. This field was discovered in 1985 and started producing in 1986. Water injection as pressure maintenance was implemented just one year after initial production, with gas lift used as the artificial lift system. As the water injection was able to provide negative voidage, the reservoir pressure began to increase, eventually enabling the wells to start to flow naturally again in 2007. In 2013, as the water cut increased to an average value of 97%, the field encountered two main problems, i.e. natural flow ability and water injection capacity to keep the voidage replacement ratio at the optimum value. Several naturally flowing wells began to ceased to flow, and the field production sharply declined to only 350 bopd at the end of 2013. By considering the existing field capacity, estimated additional recoverable reserves, and cost impact, field optimization plans were carried, with two main objectives:to optimize water injection and to install new artificial lift. The scenario for water injection optimization was intended to maintain oil production from the wells that were still able to flow naturally by focusing the injection on a specific region, restoring injection capacity at the low injection well, and adding water supply to the system. ESP was installed at the shut-in wells that still had considerable remaining reserves and offered significant gain to the additional investment required. The integration between above subsurface plan with facility engineering design and operational capability led to a 750 bopd oil gain and was able to arrest the rapid production decline in JN field. This paper will elaborate on the case study of revitalizing oil production on JN field, starting from problem identification, action taken, challenges and process integration during implementation, final result and future optimization plan for this field.
机译:JN场位于南苏门答腊座,印尼北部。该场在1985年发现的,开始于1986年注水生产的压力维持在最初的生产仅仅一年后实施,用作人工举升系统气举。当水注入能够提供负空隙率,储层压力开始增加,最终使井开始到2007年的自然再次流动在2013年,作为含水提高到97%的平均值,该领域中遇到两个主要问题,即自然流动能力和注水容量保持空隙率置换比例在最佳值。一些自然喷井开始停止流动,大田生产急剧下降到只有350桶石油当量在2013年底通过考虑现有领域的能力,预计增加可采储量和成本的影响,场优化方案获得通过,有两个主要目标:优化注水,并安装新的人工举升。注水优化该方案旨在维持石油产量从仍然能够通过专注于特定区域的注入自然流井,在低注入井注入恢复能力,并增加供水系统。 ESP是安装在关井仍然有相当的剩余储量和提供显著增益所需的额外投资。与设备工程的设计和运作能力上面地下计划之间的整合导致了750桶石油当量油增益,并能阻止在JN领域迅速产量下降。本文将详细阐述对振兴JN场石油生产,实施,最终的结果和未来的优化计划,这个领域中,从发现问题,采取的行动,挑战和流程整合开始的案例研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号