首页> 外文会议>Annual convention of the indonesian petroleum association >LESSON LEARNED ON SETUP DUAL POD BLENDERS AND PERFORMING HYDRAULIC FRACTURING WITH LIVE ANNULUS IN MUARA STRUCTURE, SANGASANGA FIELD, INDONESIA
【24h】

LESSON LEARNED ON SETUP DUAL POD BLENDERS AND PERFORMING HYDRAULIC FRACTURING WITH LIVE ANNULUS IN MUARA STRUCTURE, SANGASANGA FIELD, INDONESIA

机译:在Setup双豆荚玻璃玻璃和用Muara结构,桑萨琅田,印度尼西亚进行液压压裂的课程

获取原文

摘要

Sangasanga Field is located at Kutai Basin, which is the deepest tertiary basin in Indonesia. PT. PERTAMINA EP Asset V operates this field on behalf of Indonesian government. According to reservoir profile, hydraulic fracturing became one proven option to increase production rate in this structure. Since 2014, several hydraulic fracturing treatments had been performed in this field. Some operational problems were encountered and also some lessons learned have been implemented to ensure equipment readiness. One of the challenge is to setup dual POD Blenders on location in order to have backup equipment for supporting operation. Low-pressure rig up, silo chute modification, and equipment commissioning were done to ensure operational capabilities. When dual POD Blenders setup was done and ready for operation, another challenge was encountered related to the packer. Required weight for setting packer cannot be achieved due to lack of drill pipe and drill collar availability, thus live annulus system will be taken as the options for this operation. Assessment was performed, such as casing burst pressure rating, Christmas-tree pressure rating, and also installing and testing safety devices to ensure all operational safety were covered prior to proceed the operation since the live annulus system become first implementation in this area. Hydraulic fracturing operation was performed as per planned and decision on using live annulus is confirmed to be the correct action since real time bottom hole pressure showed actual formation behavior meanwhile the treating pressure was mostly affected by friction. In summary, this paper is discuss about operational preparation and execution of hydraulic fracturing on Sangasanga Field; with main highlights on equipment preparation and decision to use live annulus, which proven to give advantages output on making accurate decision to ensure the successful of hydraulic fracturing treatment.
机译:Sangasanga Field位于Kutai盆地,是印度尼西亚最深层的大级盆地。 Pt。 Pertamina EP Asset V代表印度尼西亚政府运营该领域。根据储层型材,液压压裂成为一个经过一定成熟的选择,可以增加这种结构的生产率。自2014年以来,在该领域进行了几种液压压裂处理。遇到了一些操作问题,也已经实施了一些经验教训,以确保设备准备。其中一个挑战是在位置设置双POD融合器,以便具有用于支持操作的备用设备。低压装备,筒仓滑槽修改和设备调试是为了确保运营能力。当Dual Pod Blenders设置完成并准备好进行操作时,遇到与包装器有关的另一个挑战。由于缺乏钻杆和钻套可用性,因此无法实现设置包装机的所需重量,因此将被视为该操作的选项。进行评估,例如套管爆破压力等级,圣诞树压力等级,以及安装和测试安全装置,以确保在该领域成为首次实现的操作之前覆盖了所有操作安全性。根据规划的,使用液压压裂操作进行,并且使用活环的决定被证实是正确的动作,因为实际底部孔压力显示实际形成行为同时,处理压力主要受摩擦的影响。总之,本文讨论了Sangasanga田地液压压裂的操作准备和执行;凭借设备准备和决定使用现场环保的主要亮点,这已经过验证的优势,为确保液压压裂处理成功的准确决定提供了优势。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号