首页> 外文会议>International Conference on Advances in Civil Infrastructure Engineering >New Approach to Treat Broken Pile in Cast-in-site Bored Pile
【24h】

New Approach to Treat Broken Pile in Cast-in-site Bored Pile

机译:在现场钻孔桩中处理破碎桩的新方法

获取原文

摘要

Many cast-in-site bore pile have broken pile because of collapsing in wall of holl. Based on the principle of mechanics, a new combination approach was proposed for dealing with the broken pile. The approach is displacing the soil in the pile by cement paste and increasing the height and the steal ratio of the top beam which is on the defect pile. Using the finite element software, we have set up the analysis model of the approach, which helps to demonstrate the rationality of this method. This method can be referenced by the reinforcement and maintenance of the bridges.
机译:许多现场钻孔桩由于霍尔墙壁塌陷而破碎的桩。基于力学原理,提出了一种新的组合方法,用于处理破碎的桩。该方法是通过水泥浆料堆积桩中的土壤,并增加缺陷桩上的顶梁的高度和倾斜比。使用有限元软件,我们已经建立了方法的分析模型,有助于证明这种方法的合理性。该方法可以通过桥梁的加固和维护来引用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号