首页> 外文会议>International Conference on Advances in Civil Infrastructure Engineering >Applied Research on Dynamic Replacement Method in Tailings Residue Subgrade Reinforcement
【24h】

Applied Research on Dynamic Replacement Method in Tailings Residue Subgrade Reinforcement

机译:尾矿残渣路基加固动态替代方法的应用研究

获取原文

摘要

Based on the reinforcing mechanism of dynamic replacement method, this article put forward the construction parameters and measures of dynamic replacement method, combining with the result of actual engineering field testing experiment. The field load test, standard penetration test and pore water pressure test results show that the characteristic value of subgrade bearing capacity is more than 130 kpa when the tailings residue subgrade has been managed with dynamic replacement method, providing references for applied research on dynamic replacement method in tailings residue subgrade reinforcement.
机译:基于动态替代方法的增强机制,本文提出了动态替代方法的施工参数和测量,与实际工程现场测试实验相结合。现场载荷试验,标准渗透试验和孔隙水压试验结果表明,当尾矿残留路基进行动态替代方法管理尾矿残留路基时,路基承载力的特征值大于130 KPA,为动态替代方法的应用研究提供了参考在尾矿残留路基加固。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号