首页> 外文会议>International Conference on Advances in Civil Infrastructure Engineering >Study on the performance of full-length pre-stressed anchor bolts
【24h】

Study on the performance of full-length pre-stressed anchor bolts

机译:全长预应力锚栓性能研究

获取原文

摘要

In order to reveal the performance of full-length pre-stressed anchor bolts, and research the rock pressure behavior law, a combination method of FLAC~(3D) and situ tests were presented, the conclusions were drawn as following: the prestress of full-length pre-stressed anchor bolt was approximately uniform distribution along the slow anchoring section of the rod, while in the fast anchoring the segment showed a negative exponential or linear form of attenuation, and the bolt axial load was biggest in the neutral point; the neutral point of full-length pre-stressed anchor bolt move to deeper of the drill hole with the reduction of rock strength, while neutral point shifting deeper would accelerate the destruction of the anchorage zone in deep rock formations, deteriorating the anchoring effect. The methods of pre-grouting and grouting bolt (or cable) should be taken to improve the anchoring force.
机译:为了揭示全长预应力锚栓的性能,并研究了岩石压力行为法,提出了FLAC〜(3D)和原位测试的组合方法,得出了以下结论:满满的预应力 - 长度预应力锚螺栓沿杆的慢锚固截面近似均匀分布,而在快速锚固中,该区段显示负指数或线性形式的衰减,并且螺栓轴向载荷在中性点中最大。全长预应力锚螺栓的中性点随着岩石强度的减小而移动到钻孔的更深,而中性点移位将加速深层岩层中的锚固区的破坏,使锚固效果劣化。应采用预灌浆和灌浆螺栓(或电缆)的方法来改善锚固力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号