首页> 外文会议>2009 rapid excavation and tunneling conference proceedings >SHORT TUNNELS = HIGH RISK?: PIPELINE CONSTRUCTION INVOLVING OPEN-CUT AND TUNNEL SEGMENTS
【24h】

SHORT TUNNELS = HIGH RISK?: PIPELINE CONSTRUCTION INVOLVING OPEN-CUT AND TUNNEL SEGMENTS

机译:短隧道=高风险?:管线建设涉及明挖和隧道段

获取原文

摘要

In the world of tunneling the glamour is in the large diameter, long tunnels, but perhaps the number of projects for small diameter and short length tunnels are greater and generally have higher risk factors. Reasons for these higher risks include both the "boiler plate" contract provisions used on these types of contracts, the technical specifications related to the tunnel work (versus the pipeline construction), the bid practices including measurement and payment and the construction. This paper reviews and comments on some of the key issues the authors have observed in recent major pipeline projects that involve a small percentage of tunneling footage of the total contract.
机译:在隧道世界中,魅力在大直径,长隧道中,但也许小直径和短长度隧道的项目数量越大,通常具有更高的风险因素。这些较高风险的原因包括对这些类型的合同中使用的“锅炉板”合同规定,与隧道工作(与管道建设)相关的技术规范,包括测量和支付以及建筑的投标实践。本文对作者在最近的主要管道项目中观察到的一些关键问题的审查和评论,这些项目涉及总合同的小隧道镜头的少量隧道镜头。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号