首页> 外文会议>International Conference on Information Technology >Scheduling jobs to contain a natural disaster: a model and complexity
【24h】

Scheduling jobs to contain a natural disaster: a model and complexity

机译:调度作业以包含自然灾害:模型和复杂性

获取原文

摘要

This paper is devoted to the problem of scheduling suppression units so that a natural disaster is dealt with as efficient as possible. The concept of deteriorating jobs is adopted, that is, the formal model of scheduling represents linearly increasing value loss as the disaster remains unsuppressed and increasing time for its suppression. More precisely, two different goals are considered: finding a suppression schedule of minimal length, and finding a suppression schedule minimizing the total completion time. The former goal is advantageous to the suppression brigade, while the latter realizes the interest of the environment. We show that these two objectives are often in conflict. Then we review the state of the art concerning efficient solutions to the problem.
机译:本文致力于调度抑制单元的问题,使自然灾害尽可能高。采用了恶化作业的概念,即,正式的调度模型代表了线性增加的价值损失,因为灾难仍然没有抑制,增加其抑制时间。更准确地说,考虑了两个不同的目标:找到最小长度的抑制计划,并找到抑制时间表最小化总完成时间。前一个目标是有利的抑制旅,而后者意识到环境的兴趣。我们表明这两个目标往往发生冲突。然后,我们审查了关于问题的有效解决方案的最先进的解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号