FBG Displacement Sensor Application Research on Geology Security Monitoring of Substation

机译:FBG位移传感器地质安全监测变电站的应用研究

获取原文

摘要

The great area crack can cause the landslide of the substation sliding.Dislocation is the significant factor to reflect the crack.Embedded the mast structure of FBG displacement sensor,the relative displacement of retaining wall in YanJin substation can be obtained.Placed 3 FBG displacement sensors on the southeast comer of the substation downstream integrated the real-time monitoring system for the dislocation crack of YanJin substation downstream.In the monitoring results of the 479 days,daily average displacement of 3# sensor located in substation downstream maximized to 1.58mm on January 27th 2011; and daily average displacement of 2# sensor located in substation downstream minimized to-1.94mm on September 18th 2011.The monthly rainfall maximized to 123.5mm,70.7mm,75.9mm in July,August,September 2011 and minimized to 26.8mm,12.9mm,and 23.3mm in January 2011,November,December 2010.Considered local precipitation,cracks closely related to the local precipitation.
机译:大面积裂缝可能导致变电站滑动的滑坡。分配是反映裂缝的重要因素。延长FBG位移传感器的桅杆结构,延金变电站的挡土墙的相对位移.Placed 3 FBG位移传感器在去南方的去域分光器下游,在下游的实时监测系统下游延新变电站的错位裂缝。在479天的监测结果中,每日平均位移3#传感器位于1月份的变电站下游至1.58mm 2011年27日; 2#传感器的日平均位移位于变电站下游,2011年9月18日最小化至1.94mm。每月降雨最大化到2011年7月,7月,7月,7月,75.9毫米75.9毫米,最小化至26.8mm,12.9mm 23.3毫米于2011年1月,11月,2010年12月。局部降水,与当地降水密切相关的裂缝。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号