首页> 外文会议>International conference on road and airfield pavement technology;3rdICPT'98 >The Establishment of Yunnan Pavement Management System Via Transplanting and Applying HDM-III Model
【24h】

The Establishment of Yunnan Pavement Management System Via Transplanting and Applying HDM-III Model

机译:移植应用HDM-III模型建立云南路面管理系统

获取原文

摘要

This article concerns The Yunnan Pavement Maintenance Management System (YPMS), which is a research project of Sino-British governmental science and technology co-operation, which aims of establishing a strategy means optimized for the maintenance and rehabilitation of grading pavement. The task group has succeeded in transplanting HDM-III to Yunna province of China, and has set up a location pavement management system - YPMS. Works that have been done for more than two years involve collecting and verifying data from 4375 km asphalt pavement of the mainly road in Yunnan, surveying the vehicle operation cost, and developing the program joined both systems of HDM-III and YPMS, based upon which come the 1991-plan of the road maintenance and rehabilitation and the scheme of the maintenance investment from 1991 to 2000, a system of objective and accurate data for Yunnan Road Bureau.
机译:本文涉及云南路面养护管理系统(YPMS),这是中英政府科技合作的一项研究项目,旨在建立一种优化的方法手段,以对平整路面的养护和修复进行优化。该工作组已成功将HDM-III移植到中国云南省,并建立了位置路面管理系统-YPMS。已经进行了两年多的工作涉及从云南主要道路的4375公里沥青路面收集和验证数据,测量车辆运营成本,并开发结合了HDM-III和YPMS的系统的程序,提出了1991年道路养护与恢复计划和1991年至2000年的养护投资计划,为云南省公路局建立了客观准确的数据体系。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号