【24h】

Airport Pavement Roughness with Nighttime Construction

机译:夜间施工的机场路面粗糙度

获取原文

摘要

Surface elevation profiles wer measured before before and after overlay operations on runways at two commercial airports in the USA. Each airport had only one runway. All overlaying was done at night, with the airports opened for normal operations during the day. The profiles were measured with an inertial profiler having software compensation for accelerometer errors. Pavement surface elevations measured with normal surveying rod and level equipment are compared with the profiler elevation measurements for one of the runways. With the exception of some very long wavelength distortion in the profiler measurements, correspondence between the two different methods is good. The profiles were processed to provide measures of roughnessfrom simulations of a straightedge, a California Profilograph, and the Boeing Bump Criteria. The roughness of the overlaid pavements is quantified and compared. Measurements of the vertical response of an instrumented B-727 aircraft on one of the runways are also presented. Transverse construction joints are shown to be significant contributors to the roughness of the pavements.
机译:在美国两个商业机场的跑道上进行覆盖操作之前和之后测量的表面高程剖面。每个机场只有一条跑道。所有的叠加都是在晚上完成的,而机场则在白天正常运营。用具有软件补偿加速度计误差的惯性轮廓仪测量轮廓。将使用常规测杆和水平仪测量的路面高程与其中一条跑道的轮廓仪高程进行比较。除了在探查器测量中出现一些非常长的波长畸变外,两种不同方法之间的对应关系很好。通过对直尺,California Profilograph和波音凹凸标准的模拟,对轮廓进行了处理以提供粗糙度的量度。量化并比较覆盖路面的粗糙度。还介绍了其中一架B-727飞机在跑道上的垂直响应的测量结果。横向施工缝被证明是造成路面粗糙度的重要因素。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号