首页> 外文会议> >Wave synchronizing crane control during water entry in offshore moonpool operations
【24h】

Wave synchronizing crane control during water entry in offshore moonpool operations

机译:海上月池作业进水期间的波浪同步起重机控制

获取原文

摘要

A new strategy for active control in heavy-lift offshore crane operations is suggested, by introducing a new concept referred to as wave synchronization. Wave synchronization reduces the hydrodynamic forces by minimization of variations in the relative vertical velocity between payload and water using a wave amplitude measurement. Wave synchronization is combined with conventional heave compensation to obtain accurate control. Experimental results using a scale model of a semi-submerged vessel with a crane and moonpool shows that wave synchronization leads to significant improvements in performance. Depending on the sea state and payload, the results indicate that the reduction in the standard deviation of the wire tension may be up to 50%.
机译:建议通过引入作为波同步的新概念来提出重型沿海起重机运营中的重大升降机近海起重机操作中的新策略。通过使用波浪幅度测量,通过最小化有效载荷和水之间的相对垂直速度的变化来减少流体动力学力。波同步与传统的升降补偿相结合,以获得精确的控制。使用带有起重机和月球池的半埋船的比例模型的实验结果表明,波同步导致性能的显着改进。根据海区和有效载荷,结果表明,线张张力标准偏差的降低可以高达50%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号