首页> 外文会议>Design, Automation & Test in Europe Conference & Exhibition;DATE 10 >Exploiting inter-event stream correlations between output event streams of non-preemptively scheduled tasks
【24h】

Exploiting inter-event stream correlations between output event streams of non-preemptively scheduled tasks

机译:利用非抢先计划任务的输出事件流之间的事件间流相关性

获取原文

摘要

In this paper we present a new technique which exploits timing-correlation between tasks for scheduling analysis in multiprocessor and distributed systems with non-preemptive scheduled resources. Previously developed techniques also allow capturing and exploiting timing-correlation in distributed systems. However, they focus on timing correlations resulting from data dependencies between tasks. The new technique presented in this paper is orthogonal to the existing ones and allows capturing timing-correlations between the output event streams of tasks resulting from the use of a non-preemptive scheduling policy on a resource. We also show how these timing-correlations can be exploited to calculate tighter bounds for the worst-case response time analysis for tasks activated by such correlated event streams.
机译:在本文中,我们提出了一种新技术,该技术利用任务之间的时序相关性进行多处理器和具有非抢先调度资源的分布式系统中的调度分析。先前开发的技术还允许捕获和利用分布式系统中的时序相关性。但是,它们专注于任务之间数据相关性导致的时序相关性。本文中提出的新技术与现有技术正交,并且允许捕获由于在资源上使用非抢占式调度策略而导致的任务输出事件流之间的时间相关性。我们还展示了如何利用这些时间相关性来为由此类相关事件流激活的任务的最坏情况响应时间分析计算更严格的界限。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号