In an apparatus for evaluating reliability of a nuclear power plant operator, an expected task finishing time for each task of the operator is calculated based on input data for reliability evaluation of the operator to determine a task completion time for each task of the operator based on the calculated expected task finishing time and the input data. An initial time for the tasks is determined based on the input data and the task completion time for a current task. A total execution time of the operator is calculated based on the determined task completion time and initial time. An available time allowed for the operator to complete the tasks is calculated based on a predetermined allowed time and the determined initial time. A task failure probability is obtained from the difference between the calculated total execution time and the calculated available time based on probability distribution information.
机译:在用于评估核电厂运营商的可靠性的装置中,基于用于操作者的可靠性评估的输入数据来计算操作员的每个任务的预期任务完成时间,以确定基于操作员的每个任务的任务完成时间 计算出的预期任务完成时间和输入数据。 基于输入数据和当前任务的任务完成时间来确定任务的初始时间。 根据所确定的任务完成时间和初始时间计算操作员的总执行时间。 基于预定允许的时间和确定的初始时间来计算允许操作员完成任务的可用时间。 根据概率分布信息,从计算的总执行时间和计算的可用时间之间获得任务失败概率。

著录项

  • 公开/公告号US11238395B2

    专利类型

  • 公开/公告日2022-02-01

    原文格式PDF

  • 申请/专利权人 KOREA ATOMIC ENERGY RESEARCH INSTITUTE;

    申请/专利号US201916595000

  • 发明设计人 YOCHAN KIM;JAEWHAN KIM;

    申请日2019-10-07

  • 分类号G06Q10/06;G21D3;G06F17/18;

  • 国家 US

  • 入库时间 2022-08-24 23:35:02

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号