Problem to be solved: to provide a new construction method of a roof building installed in a river management facility or a coast maintenance facility.The construction method of the Kamiya building in the river management facilities or the coast preservation facilities isFor each wall unitThe process of manufacturing an aluminum alloy attachment frame 40 sized to correspond to the size of one wall unit by one or more sheetsAt the site near the installation site of the Kamiya buildingAttaching a predetermined outer wall panel 50 to the attachment frameAn attachment frame attached with an external wall panel is hung by a lifting deviceMove ahead of the wall unitThe placement of the attachment frame and the wall unit so as to overlap each otherAttachment frame with external wall panelWork from the interior of the buildingIt is provided with a step to be fixed to the wall unit.Diagram
展开▼