PROBLEM TO BE SOLVED: To perform construction as designed surely and easily by comparing design data with actual construction data when constructing and managing a construction structure.;SOLUTION: An on-site construction management system includes: design data storage means 10 for storing design data of a construction structure; actual construction data acquisition means 20 for acquiring actual construction data; actual construction data analysis means 30 for analyzing an aspect of an actually constructed construction structure; shape comparison and determination means 40 for determining whether the design data and the actual construction data coincide with each other; display means 50 for displaying information related to the design data and the actual construction data; position data acquisition means 60 for acquiring position data of the display means 50; display control means 70 for controlling the display means 50 so as to display the design data and the actual construction data in a superimposed fashion; and warning means 80 for specifying a position where the design data and the actual construction data are different and giving a warning.;SELECTED DRAWING: Figure 1;COPYRIGHT: (C)2018,JPO&INPIT
展开▼