Problem to be solved: to provide a diamond making system for creating a high quality operation diamond even in case of complicated components.In the diamond making systemA diamond making deviceBased on the information stored in the storage device 13 and the evaluation index improvement information which stores the evaluation index improvement degree information 320 which memorized the relationship between the change of the constituent elements of the operation schedule and the change of the quality from the viewpoint of the operation schedule due to the change of the constituent elements.Change diamond element selection processing unit 120 which selects the component of the operation diamond to improve the quality of the operation diamond andAmong a plurality of diamond modeling models capable of creating a traffic scheduleAn optimization model selection processing unit 130 which selects the diamond making model which improves the quality of the whole operation diamond by changing the selected components andBased on the selected diamond creation modelA diamond optimization processor 140 for creating a new operation scheduleAn operation device 11 is provided.Diagram
展开▼