首页> 外国专利> METHOD AND SUCTION DREDGING INSTALLATION FOR CONVEYING A SUSPENSION OF MAINLY DREDGING SPOIL AND WATER THROUGH A PIPE

METHOD AND SUCTION DREDGING INSTALLATION FOR CONVEYING A SUSPENSION OF MAINLY DREDGING SPOIL AND WATER THROUGH A PIPE

机译:通过管道输送主要挖泥和倒水的方法和挖泥安装

摘要

1,272,152. Dredging. INGENIEURSBUREAU VOOR SYSTEMEN EN OCTROOIEN SPANSTAAL N.V. 23 April, 1969 [24 April, 1968], No. 20836/69. Heading E1F. [Also in Division G1] In an apparatus or method of assaying a mixture, which includes water, any other substance (such as dredging spoil) and a gas, flowing through a pipe, pressure at upper, middle and lower conduits are picked-up by pressure difference pick-ups 443, 496 and 497; the pressure in upper conduit sections 492, 493 being higher than in the lower conduit sections; velocity meters 424j, 424k indicate the mixture velocity respectively in the upwardly and downwardly directed portions of the "U" shaped pipe, and the density of the mixture is thus obtained so that it is then possible to calculate the amount of other substance, such as dredging spoil, in the mixture. By passing the measured results to a calculating amplifier, provided with factors according to a formula and integrating the output over a specified time the total volume of dredging spoil, passing in such specified time, can be determined.
机译:1,272,152。疏ed。于SPANSTAAL N.V.的原系统工程公司,1969年4月23日[1968年4月24日],第20836/69号。标题E1F。 [也在G1分部中]在一种分析混合物的设备或方法中,该混合物包括水,任何其他物质(例如挖泥)和气体,它们流经管道,需要拾取上,中,下导管的压力通过压力差传感器443、496和497;上导管部分492、493中的压力高于下导管部分中的压力;速度计424j,424k分别指示“ U”形管的向上和向下部分中的混合物速度,从而获得混合物的密度,从而可以计算其他物质的量,例如挖泥,在混合物中。通过将测量结果传递给计算放大器,该放大器具有根据公式的系数,并在指定时间内对输出进行积分,可以确定经过指定时间的挖泥的总体积。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号