首页> 外国专利> Tower crane installation process - uses tower erection rams with prop to lift base for travel bogie removal

Tower crane installation process - uses tower erection rams with prop to lift base for travel bogie removal

机译:塔式起重机的安装过程-使用带有支撑的塔架立柱来抬起底座,以拆卸行走转向架

摘要

The tower erecting rams (5) are extended slightly, to allow a prop (25) to be placed between the lower part (3) of the tower and the first bogie (16), after which they are retracted so as to lift the base (1) in relation to the first bogie, it being then chocked in this position. Extension of the rams then tilts the base again and lifts the second bogie (13), so that this can be removed. The rams are then retracted to bring the travel rollers (12) at this end down onto the travel rails (27) or a foundation and remove the chocks. They are extended again to lower the other rollers (11) onto the rails. The prop and first bogie are finally uncoupled.
机译:塔架立柱(5)略微伸出,以允许将支柱(25)放置在塔架下部(3)与第一转向架(16)之间,然后将其缩回以抬起基座(1)关于第一个转向架,然后将其塞在该位置。然后,推杆的伸出再次使基座倾斜并抬起第二转向架(13),以便将其卸下。然后,将闸板缩回,以将移动滚轮(12)的一端放到移动滑轨(27)或基座上,并取下轴承座。它们再次伸出,以将其他辊子(11)降低到导轨上。支柱和第一转向架最终解开。

著录项

  • 公开/公告号FR2336341B3

    专利类型

  • 公开/公告日1978-11-03

    原文格式PDF

  • 申请/专利权人 CADILLON ROGER;

    申请/专利号FR19750039910

  • 发明设计人

    申请日1975-12-22

  • 分类号B66C23/26;

  • 国家 FR

  • 入库时间 2022-08-22 21:47:39

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号