PURPOSE:To increase resistance to unbalanced earth pressure and lessen the amount of back-filling soil by a method in which excavated soil and sand are stored, reinforced concrete segment is used as a sheathing material for excavated pit, and the excavated soil and sand are back-filled in space within the foundation. CONSTITUTION:The sheathing work for the inner wall of an excavated pit is constituted by a reinforced concrete segment 1 and a steel key segment 5 into a circular wall form. And, a rod 7 is pierced through the segement 1 and hung down, and the lower part of the circular wall is excavated. The excavated soil and sand are stored in a temporary yard. Then, the next segment is placed on an assembler 11 and connected with the next circular wall by means of a rod 7 and a coupler 8 in the lower part of the previously assembled circular wall. The operations are repeated until a given depth is reached. The bottom part is excavated in a wider range toward the outside, an expanded bottom segment 9 is assembled, a bottom floor plate 10 is attached to the inside, and grout is injected. And, the excavated soil and sand R are back-filled in the inside of the foundation.
机译:用途:为提高抗不平衡土压力的能力并减少回填土量,采用了一种储存挖土和砂土的方法,钢筋混凝土段用作挖土坑的护套材料,并且挖出土和砂被用作土方材料。在基础内回填空间。组成:开挖坑内壁的护壁工作由钢筋混凝土部分1和钢制钥匙部分5制成圆形墙体形式。并且,杆7刺穿段1并垂下,并且圆壁的下部被挖出。挖出的土壤和沙子存放在临时院子里。然后,将下一段放置在组装器11上,并通过在先前组装的圆形壁的下部中的杆7和联接器8与下一圆形壁连接。重复该操作,直到达到给定深度为止。底部朝着外部扩大开挖,组装扩大的底部段9,在内部安装底部底板10,并注入水泥浆。并且,挖出的土壤和沙子R被回填在基础内部。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号