首页> 外国专利> METHOD OF INSTALLING SPLIT HYDRAULIC JACK FOR HYDRAULIC ELEVATOR

METHOD OF INSTALLING SPLIT HYDRAULIC JACK FOR HYDRAULIC ELEVATOR

机译:液压升降机分体式液压千斤顶的安装方法

摘要

PURPOSE:To improve the working efficiency of installing split hydraulic jacks in narrow space by temporarily securing upper and lower jack assembly to installing position as they are, connecting corresponding members to each other, and centering the entire assembly. CONSTITUTION:A lower jack assembly is placed on a jack bearer 11 secured to predetermined position of a pit 9. After the lower jack assembly is then centered as predetermined, it is secured onto wall surface 10 via bracket 12 and U-bolt 13. After a lower plunger member 3b is then pulled out and is held by a plunger holder 17, an upper cap 7 is removed. After an upper jack assembly is then lifted directly above the lower jack assembly to be temporarily secured thereto, the threaded portion 2c of the upper plunger member 3a is connected to the coupler 4 of the lower plunger member 3b. Then, the upper cylinder assembly is correctly secured to the wall surface 10 by the U-bolt 13c to thus complete the installation of the jack.
机译:目的:通过将上下千斤顶组件暂时固定在安装位置,将相应的构件彼此连接以及将整个组件居中,以提高在狭窄空间中安装分体式液压千斤顶的工作效率。组成:下部千斤顶组件被放置在固定到坑9预定位置的千斤顶支架11上。在将下部千斤顶组件按预定的中心定位之后,它通过托架12和U型螺栓13固定在墙面10上。然后,将下柱塞部件3b拉出并由柱塞支架17保持,卸下上盖7。然后,在将上千斤顶组件直接提升到下千斤顶组件上方以将其临时固定之后,将上柱塞部件3a的螺纹部分2c连接到下柱塞部件3b的连接器4。然后,上液压缸组件通过U型螺栓13c正确地固定到壁表面10,从而完成千斤顶的安装。

著录项

  • 公开/公告号JPS5846432B2

    专利类型

  • 公开/公告日1983-10-17

    原文格式PDF

  • 申请/专利权人 MITSUBISHI ELECTRIC CORP;

    申请/专利号JP19770143676

  • 发明设计人 OOTOMI SADAYUKI;KIMURA NOBUHITO;

    申请日1977-11-30

  • 分类号B66F3/26;B66B9/04;

  • 国家 JP

  • 入库时间 2022-08-22 11:37:30

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号