首页> 外国专利> METHOD OF SUPPLYING SAND IN EXECUTION OF SAND PILE USING WATER-ADDED SAND

METHOD OF SUPPLYING SAND IN EXECUTION OF SAND PILE USING WATER-ADDED SAND

机译:水浸砂在砂桩中供应砂的方法

摘要

PURPOSE:To rationally feed sand, by a method wherein water-added sand is discharged as a compressed air is fed in a hollow pipe, and after pull off of the pipe is stopped in a stage before height of sand is lowered to the level lower than a level equivalent to active earth pressure in a depth to the lower end of the pipe, sand is supplied. CONSTITUTION:Water-added sand 2 is fed in a hollow pipe 1-penetrated into a ground, and the sand is held in a fluid manner by the use of a means such as vibration. Thereafter, the hollow pipe 1 is pulled off as a compressed air is fed in the hollow pipe 1 through a compressed air feed and exhaust pipe 3, and the water-added sand 2 in a fluid state is discharged. Pull off of the hollow pipe 1 is stopped at a stage before the height of the water-added sand 2 is lowered to lower than a height Hb equivalent to an active earth pressure in a depth Zb to the lower end of the hollow pipe 1. Further, after a compressed air in the hollow pipe 1 is exhausted, water-added sand is supplied in the hollow pipe 1 from a hopper 5.
机译:目的:为了合理地送入砂子,采用一种方法,其中将加有水的砂子作为压缩空气送入空心管中,然后在将砂子的高度降低到较低水平之前的阶段停止抽出管子之后在比管道下端深处的有效土压力高出一定水平的范围内,要供应沙子。组成:加水的沙子2被送入一根穿透地面的空心管1中,并通过使用振动等手段以流动的方式保持沙子。此后,随着压缩空气通过压缩空气进排气管3被送入中空管1中,中空管1被拔出,并且流态的加水砂2被排出。在将加水砂2的高度降低到低于相当于活动土压力的高度Hb的深度之前的阶段中空管1的拔出停止,深度Hb到中空管1的下端。另外,在中空管1内的压缩空气被排出之后,从漏斗5向中空管1内供应加水的沙子。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号