首页>
外国专利>
SCOURING PREVENTION WORK FOR CAISSON FOUNDATION
SCOURING PREVENTION WORK FOR CAISSON FOUNDATION
展开▼
机译:沉箱基础的冲刷预防工作
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE:To prevent the occurrence of scouring during the settling period of caisson by a method in which a caisson with cutting edge is settled along a sheet laid on the bottom under water for preventing scouring, and the sheet is cut off and removed according to the progress of work. CONSTITUTION:Plural sheets 8 having bags 2 incorporated with weights 3 on its both ends for preventing scouring are adjacently laid by lapping the edges of the sheets 8 on the bottom 4 on which a caisson 5 is to be settled under water. The caisson 5 is settled on the sheets 8 and the inside sheet 1 of the sheets 8 is cut off along its lower end 5b by the cutting edge 6. The sheet 1 is removed, together with the weight 3, from the cutting edge 6.
展开▼