首页> 外国专利> EXCAVATED SOIL CARRYING-OUT METHOD IN TUNNEL EXCAVATION AND DEVICE THEREOF

EXCAVATED SOIL CARRYING-OUT METHOD IN TUNNEL EXCAVATION AND DEVICE THEREOF

机译:隧道开挖中的挖土运移方法及其装置

摘要

PURPOSE:To enhance the efficiency of excavation work by providing a carrying out and loading truck, braking and starting truck, capsule moving device and additional pipe line to a device for carrying capsules having excavated soil thereinto in the case of tunnel excavation in the pipeline. CONSTITUTION:A loading truck 5 is driven forward together with the advancement of a facing, materials for a tunnel carried through capsule 2 are eliminated from the capsule 2, and excavated soil 11 is loaded into the capsule. After that, a braking and starting truck 6 is intermittently driven forward after the truck 5, and braking and starting of the capsule 2 are controlled. Then, a capsule moving device 7 constituted of a temporary extended rail 71 and a tractor 72 travels the capsule 2 on the temporary extended rail 71. A pipe line 3 for moving the capsule 2 is increased in a new section made after the advancement of the braking and starting truck 6. According to the constitution, general work efficiency of tunnel excavation is improved, and a construction period can be shortened.
机译:目的:通过在管道中进行隧道开挖的情况下,提供装卸车,制动和起动车,胶囊移动装置和附加管线,以将开挖的土壤装入其中的装置,以提高开挖工作的效率。构成:装载卡车5与面板的前进一起被向前驱动,穿过胶囊2的隧道材料被从胶囊2中去除,并且被挖掘的土壤11被装载到胶囊中。此后,在卡车5之后间歇地向前驱动制动和启动卡车6,并且控制胶囊2的制动和启动。然后,由临时延伸轨道71和牵引器72构成的胶囊移动装置7使胶囊2在临时延伸轨道71上行进。用于使胶囊2移动的管路3在移动后的新部分中增加。制动起步车6.根据上述构成,可以提高隧道开挖的总体工作效率,并可以缩短工期。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号