首页>
外国专利>
METHOD FOR PRODUCING A TUNNEL WITH LOW COVERAGE UNDER RAILWAY SYSTEMS OR THE LIKE
METHOD FOR PRODUCING A TUNNEL WITH LOW COVERAGE UNDER RAILWAY SYSTEMS OR THE LIKE
展开▼
机译:在铁路系统或类似情况下生产低覆盖率隧道的方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
In the method for producing an underground structure, preferably a tunnel, with little earth cover under railway tracks or the like, the individual concreted structure or tunnel sections are advanced in the timed shifting process after their production. In order to prevent movements in the covering earth and the railway tracks during the digging-out of the earth at the local face and during the advancing of the tunnel sections, the rails, together with the sleepers and ballast foundation, are removed in sections. In a dug-out, flat pit is installed a covering reinforced concrete slab, onto which the ballast bed and the track skeleton are mounted again. The same procedure is followed in neighbouring areas and the reinforced concrete slab has further reinforced concrete slabs concreted onto it until the region through which a tunnel is to be driven is overlapped by a continuous concrete slab. After this concrete slab, which forms a securing means for the track, has been erected, the tunnel sections are advanced underneath said slab. IMAGE
展开▼