首页> 外国专利> Process for the rapid construction of two superimposed roadways with a structure placed on the existing road without hindering the traffic

Process for the rapid construction of two superimposed roadways with a structure placed on the existing road without hindering the traffic

机译:快速构筑两条叠加的道路并在现有道路上放置结构而不会妨碍交通的过程

摘要

Process and device permitting doubling of the flow on the lanes bordering the central reserve of motorways, comprising a minimum of 3 lanes in each direction, causing no disturbance of the traffic for the duration of the works. The assembly consists of a chain of prefabricated elements, assembled mechanically or by means of reinforced concrete, prestressed or otherwise. The installation works may commence without land acquisitions and without prior foundation works. The dimensions of the elements as well as the design of the installation machine permit execution of the installation works while always leaving the lanes adjacent to the lanes in question free and hindering the latter only during the peak hours of traffic chosen for carrying out installation of the elements. The changing of lanes is possible on both levels. IMAGE
机译:允许在与高速公路中央储备区接壤的车道上流量加倍的过程和设备,每个方向上至少包括3条车道,在整个工作期间不会对交通造成干扰。该组件由一系列预制元件组成,这些预制元件通过机械方式或通过预应力或其他方式的钢筋混凝土进行组装。安装工程可以在没有征地和没有事先进行基础工程的情况下开始。元件的尺寸以及安装机器的设计允许执行安装工作,同时始终使与所讨论的车道相邻的车道畅通无阻,并且仅在为安装该车道进行安装而选择的交通高峰时段才阻碍后者。元素。在两个级别上都可以更改车道。 <图像>

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号