首页> 外国专利> METHOD FOR FORMATION OF EXTERNAL DUMP IN MINERAL OPENCAST MINING

METHOD FOR FORMATION OF EXTERNAL DUMP IN MINERAL OPENCAST MINING

机译:露天矿开采中外部结块的形成方法

摘要

FIELD: mining industry. SUBSTANCE: method includes construction of tunnel above transportation communications. Exits and pioneer embankment are formed over design outline of open pit, and successive filling of overburden rocks is made from low laying to higher laying tiers with filling of constructed tunnel. Tunnel is constructed within design outlines of dump. EFFECT: rational utilization of area for dump in locations of transportation communications owing to provision of rock filling in preset place of dump. 3 dwg
机译:领域:采矿业。实质:方法包括在运输通讯上方建造隧道。在露天矿的设计轮廓上形成出口和先驱路堤,并从低铺层到高铺层依次填充已覆盖的隧道,从而完成了覆盖岩的连续填充。隧道是在垃圾场的设计轮廓内建造的。效果:由于在垃圾堆的预设位置提供了堆石料,因此在交通通讯场所合理地利用了垃圾堆区域。 3 dwg

著录项

  • 公开/公告号RU2009320C1

    专利类型

  • 公开/公告日1994-03-15

    原文格式PDF

  • 申请/专利权人 SHARIN VLADIMIR VASILEVICH;

    申请/专利号SU19904896747

  • 发明设计人 SHARIN VLADIMIR V;

    申请日1990-12-26

  • 分类号E21C41/26;

  • 国家 RU

  • 入库时间 2022-08-22 04:37:14

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号