Construction construction method null of the joist throb which uses the precast concrete large

机译:大采用预制混凝土的龙骨th的施工方法

摘要

PURPOSE:To make field-work efficient by providing a joist slub locking recessed portion at the upper end of a girder member made of precast concrete, and also providing a joist slub with an engagement portion, and fitting their locking portions with each other when they are set. CONSTITUTION:A joist locking recessed portion 1 is provided at the upper end of a precast concrete girder member A. An engagement portion corresponding to the locking recessed portion of the girder member A is provided on the end face of the joist slub B. When the girder member A and the joist slub B are set they are fitted with each other at their respective locking portions and, after reinforcement is arranged in a predetermined way, concrete is placed on the upper portion so that the girder member A and the joist slub B are integrated with each other. Thus labor required for constructing work is largely reduced.
机译:目的:通过在预制混凝土制成的梁构件的上端提供托梁节锁凹入部分,并提供带有接合部分的托梁节,并且当它们的锁定部分彼此配合时,使现场作业高效被设置。组成:在预制混凝土梁构件A的上端设有托梁锁定凹部1。在梁梁B的端面上设有与梁构件A的锁定凹部相对应的接合部。设置梁构件A和托梁竹节B在它们各自的锁定部分处彼此装配,并且在以预定方式布置钢筋之后,在上部上浇筑混凝土,从而梁构件A和托梁竹节B彼此集成。因此,大大减少了建造工作所需的劳动力。

著录项

  • 公开/公告号JPH0781355B2

    专利类型

  • 公开/公告日1995-08-30

    原文格式PDF

  • 申请/专利权人 株式会社フジタ;

    申请/专利号JP19890078651

  • 发明设计人 柳澤 宗吉;

    申请日1989-03-31

  • 分类号E04B5/32;

  • 国家 JP

  • 入库时间 2022-08-22 04:27:41