JOINT CONSTRUCTION OF UP AND DOWN COLUMNS WITH BEAM AND JOINT METHOD

机译:梁与节点法联合建立上下柱

摘要

PROBLEM TO BE SOLVED: To simplify working in a plant as well as field execution when up and down columns are connected to a beam. ;SOLUTION: A joint box 3 is welded to the upper end of a lower side steel pipe column 1B. The joint box 3 is equipped with diaphragms 5A and 5B in up and down surfaces thereof, an insertion hole 6 of an upper side steel pipe column 1A is provided to the upper diaphragm 5A, and beam connecting bolt insertion holes 7 are provided to the sides of the joint box. The end of the beam 2 is connected to the sides of the joint box 3 with bolts, and the lower end of the upper side steel pipe column 1A is inserted into the insertion hole 6 on the upper surface of the joint box 3. Grouting holes 8 are provided to the sides of the lower end of the upper side steel pipe column 1A, and the joint box 3 and the inside of the lower end of the upper side steel pipe column 1A are filled with concrete or gruout such as mortar, etc.;COPYRIGHT: (C)1997,JPO
机译:要解决的问题:上下柱连接到梁时,简化工厂的工作以及现场执行。 ;解决方案:将接线盒3焊接到下侧钢管柱1B的上端。接头箱3在其上下表面上具有隔膜5A和5B,在上隔膜5A上设有上侧钢管柱1A的插入孔6,在侧面上设有梁连接螺栓插入孔7。关节盒的。梁2的端部通过螺栓连接至接线盒3的侧面,并且上侧钢管柱1A的下端插入到接线盒3的上表面的插入孔6中。在上侧钢管柱1A的下端侧设置有图8所示的连接器,在接头箱3和上侧钢管柱1A的下端的内侧填充有砂浆等混凝土或灌浆。 。;版权:(C)1997,日本特许厅

著录项

  • 公开/公告号JPH09209451A

    专利类型

  • 公开/公告日1997-08-12

    原文格式PDF

  • 申请/专利权人 DAIWA HOUSE IND CO LTD;

    申请/专利号JP19960046722

  • 发明设计人 HORIKIRI TAKEHIRO;

    申请日1996-02-07

  • 分类号E04B1/24;E04B1/16;

  • 国家 JP

  • 入库时间 2022-08-22 03:37:26

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号