首页> 外国专利> MOUNTING CONSTRUCTION OF CURTAIN WALL UNIT AND MULLION BEARING THE CURTAIN WALL UNIT AND JOINT CONSTRUCTION OF TRANSOM

MOUNTING CONSTRUCTION OF CURTAIN WALL UNIT AND MULLION BEARING THE CURTAIN WALL UNIT AND JOINT CONSTRUCTION OF TRANSOM

机译:幕墙单元的安装施工和竖框承载幕墙单元和横梁的共同施工

摘要

PROBLEM TO BE SOLVED: To enable reduction of the size of a mounting section to a mullion with an enlarged window opening-area, and to enable the reduction of the volume of operation. ;SOLUTION: A mounting block 42 and a bearing block are fixed to the outdoor surface 41 of a mullion 40. The lower end faces of jambs 2 of a curtain wall unit 1 are mounted on the bearing block, and joint brackets 30 fixed to the outside surfaces of the jambs 2 are mounted to the mounting block 42 with bolts. Since the jambs 2 of the curtain wall 1 are mounted to the mullion 40, the size of a mounting section such as each of the joint brackets 30 can be reduced. Since the joint brackets 30 are covered with the mullion 40, the volume of operation can be reduced because decorated material, etc., are not required to mount.;COPYRIGHT: (C)1997,JPO
机译:要解决的问题:减小安装部分的尺寸,使窗框开口面积增大的竖框,并减小操作量。 ;解决方案:将安装块42和轴承块固定在竖框40的室外表面41上。幕墙单元1的门框2的下端面安装在轴承块上,并且将关节托架30固定到侧柱2的外表面通过螺栓安装在安装块42上。由于幕墙1的门框2安装在竖框40上,因此能够减小诸如各关节托架30的安装部的尺寸。由于关节托架30被竖框40覆盖,可以减少操作量,因为不需要安装装饰材料等。版权所有:(C)1997,JPO

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号