The procedure for fixing a telephone box to the ground consists in fixing in a hole (22) in the ground a vertical threaded rod (21). A securing shoe (23) is installed on the rod. The shoe upper surface (23a) is adjusted in height by screwing it on the rod. The shoe is then prevented from rotating and a sealing material is injected into it. The shoe is prevented from rotating and translating relative to the rod by a locking part (26) having a central hole (27) through which the rod passes. It has a side hole (28) which is located opposite a housing (32) in the shoe upper front surface. The side hole and the housing can receive an indexing bolt (29).
展开▼