首页> 外国专利> Procedure for exploring planned tunnel routes

Procedure for exploring planned tunnel routes

机译:探索计划的隧道路线的程序

摘要

A through pilot bore is produced with a bore head guided in the bore path along the planned tunnel course. Samples are removed from the pilot bore for geo-physical examination. The pilot bore is produced along the centre line of the planned tunnel course. In the production of the pilot bore, bore advance parameters are highlighted, which can then be related to the bore hole investigation. One or more of the following bore advance parameters are established: bore pressure, advance speed, abrasion of the bore head. Samples are taken from the flushing back flow of the pilot boring. Pre-investigation is enacted by geo-physical depth probing of the surface.
机译:产生通孔,并在钻孔路径中沿计划的隧道走向引导一个钻孔头。从先导孔中取出样品进行地球物理检查。导向孔沿计划的隧道路线的中心线产生。在先导孔的生产中,突出了孔前进参数,然后可以将这些参数与钻孔研究相关。建立以下钻孔前进参数中的一个或多个:钻孔压力,前进速度,钻孔头的磨损。从先导钻孔的冲洗回流中取样。通过表面的地球物理深度探测来进行预调查。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号