PROBLEM TO BE SOLVED: To have firm construction to simply construct a tomb at a low cost and to facilitate dealing of surplus soil. ;SOLUTION: An outside frame 2 is installed at a tomb construction lot so as to form its plane surface in an approximately rectangular shape. A plurality of inside frames 3a-3f forming their plane surfaces in a rectangular shape respectively are so arranged that they are brought into contact with the inside of the outside frame 2 at spaces for forming a charnel house, and the inside frames 3a-3f are made to adhere to the outside frame 2. The upper parts of the inside frames 3a-3f are covered with a plurality of cover materials. The tomb and an urn covers are arranged on the circumference of the charnel house 4 to close the charnel house 4.;COPYRIGHT: (C)1998,JPO
展开▼