PROBLEM TO BE SOLVED: To build up the system where a designer, an estimating person and a person engaged in a construction work can depend on unified information by controlling the construction work using CAD as an interface. SOLUTION: A process control, a progress control, cost control and the like are undertaken via the first stage where database 1 prepared along coordinate axes are read, and a building and/or an underground pipe is automatically drawn 2 using CAD, the second stage where contents including coordinates and shapes due to the deformation of the building and/or the underground pipe are read into the database 1 and deformation treatment 3 is undertaken, and the third stage where an automatic calculation is made about the change of a material quantity resulting from the deformation of the building and/or the underground pipe, and estimation treatment 5 is implemented. As a result, all concerned persons efficiently carry out a general work control work and a facility maintenance work, relying on unified information.
机译:要解决的问题:要构建一个系统,在该系统中,设计师,估算人员和从事建筑工作的人员可以通过使用CAD作为界面控制建筑工作来依赖统一信息。解决方案:通过第一阶段进行过程控制,进度控制,成本控制等工作,其中读取沿坐标轴准备的数据库1,并使用CAD自动绘制建筑物和/或地下管道2,第二阶段其中将包括由于建筑物和/或地下管道的变形而导致的坐标和形状的内容读入数据库1并进行变形处理3,第三阶段是对所产生的物料量变化进行自动计算根据建筑物和/或地下管道的变形,实施估算处理5。结果,所有相关人员依靠统一的信息有效地执行了一般的工作控制工作和设施维护工作。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号