In the aspect of road construction, in order to prevent the sand from flowing out from the cut-off surface or the new sand embankment, in order to prevent the collapse, not only can it be simply set up, but also in the lawn construction and landscaping project, it will not carry out another turf transplantation, but also carry out the lawn cultivation and landscaping project itself. Fixed structure of mats for civil engineering with convenient management,The cushion (1) is fixed at an interval of 30-50cm from the upper part to the lower part of the cushion (1) to form a biodegradable synthetic resin or a fixed pin (4) composed of trees with a length of 10-30cm to form a suspension Chin (6) on the head, so as to be close to the exhalation surface (5) of the dike or cut-off pool,The middle part and the bottom edge of the cushion (1) are fixed at an interval of 50-200cm.
展开▼