首页>
外国专利>
BALLAST LEVELING MECHANICAL AND METHOD OF LAYING BALLAST FOR TRACK
BALLAST LEVELING MECHANICAL AND METHOD OF LAYING BALLAST FOR TRACK
展开▼
机译:道ALL的流平机理及铺设道B的方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide a ballast leveling mechanical equipment capable of laying ballast more levelly for track. SOLUTION: A ballast leveving mechanical equipment 1 comprises a machine frame 3 designed for moving under carriages 2 on track is equipped with an adjustable ballast leveling device 20 for laying ballast for track 6. In front of the ballast leveling device 20 in the operating direction of the ballast leveling mechanical equipment 1, contacts type sensing units 29 are provided for detecting actual ballast profile extending in a direction perpendicular to the longitudinal direction of the track or ballast compacting equipment. A position sensor 25 for detecting the change in the position relative to the machine frame 3 operates together with the ballast leveling device 20. A control unit 31 is equipped with a memory unit for storing desired ballast profiles. By using these, a track section having shortage or excess ballast is recognized and the control of the ballast leveling device 20 becomes possible.
展开▼