首页> 外国专利> Rebar destination set for formwork and law frame construction method using this formwork

Rebar destination set for formwork and law frame construction method using this formwork

机译:模板的钢筋目标位置和使用此模板的法律框架构造方法

摘要

PURPOSE: To start spraying and placing operations only by installation of a form on a cage so as to enhance operability by providing cage locks connected to perforated plates, and a main body having skirt locking members by which interval-holding reinforcement, locks, and holding reinforcement are connected integral with one another. ;CONSTITUTION: The size between the end 10A of main-reinforcement connecting reinforcement 10, 11 and vertical connecting reinforcement 20 is set, and the main reinforcement 51, 52 of a cage 50 is held therein to enhance the stability of a locked state, and the cage 50 is welded at a predetermined height to anchors 55 driven into a face of slope. Next, a skirt S is installed on the face of slope with a form put thereover; i.e., one side of the skirt S is relatively inserted between a perforated plate 1 and a skirt locking member 50 and is temporarily fixed in an appropriate position by means of whips, etc. Thereafter, a hardener is poured into the space between the perforated plates 1, 1 to construct a slope form. Thus excellent operability is provided, and positioning of the form can be achieved with remarkable precision.;COPYRIGHT: (C)1996,JPO
机译:目的:仅通过将模板安装在笼子上以开始喷涂和放置操作,以通过提供连接到穿孔板上的笼子锁来增强可操作性,以及具有裙部锁定构件的主体,通过该裙板锁定构件,间隔保持加固,锁定和保持钢筋相互连接在一起。组成:设定主钢筋连接加强件10、11的端部10A和垂直连接钢筋20之间的尺寸,并在其中保持笼子50的主加强件51、52,以增强锁定状态的稳定性,并且保持架50以预定的高度焊接到打入斜面的锚固件55。接下来,将裙板S安装在倾斜的表面上,并在其上放置模板。即,裙部S的一侧相对地插入在穿孔板1和裙部锁定构件50之间,并通过鞭子等临时固定在适当的位置。然后,将硬化剂注入到穿孔板之间的空间中。用1、1构造一个坡度表格。因此,提供了出色的可操作性,并且可以以极高的精度实现表格的定位。;版权所有:(C)1996,日本特许厅

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号