首页>
外国专利>
EXECUTION METHOD OF CIVIL ENGINEERING CONSTRUCTION, HANGING DEVICE FOR CIVIL ENGINEERING CONSTRUCTION EXECUTION AND CIVIL ENGINEERING CONSTRUCTION UNIT
EXECUTION METHOD OF CIVIL ENGINEERING CONSTRUCTION, HANGING DEVICE FOR CIVIL ENGINEERING CONSTRUCTION EXECUTION AND CIVIL ENGINEERING CONSTRUCTION UNIT
PROBLEM TO BE SOLVED: To provide the execution method of a civil engineering construction capable of easily performing execution even in the case where execution is performed for a submerged execution face. ;SOLUTION: A long civil engineering construction unit 2 connecting a plurality of short natural stone holding units 6 attaching a plurality of natural stones 8 is prepared on one face side of a gauze, and the long civil engineering construction unit 2 is transported upward of a submerged execution face in water in a hanging state. Thereafter, the long civil engineering construction unit 2 is lowered on the submerged execution face 5b and arrangement working, connection working or the like is not needed in water.;COPYRIGHT: (C)2000,JPO
展开▼